Brahmani Right Basin, Dhenkanal

Pani Panchayat2009-2010

Physical and Financial progress up to Aug-2010

About Brahmani Basin

 

Office of the Chief Engineer & Basin Manager, Brahmani Right Basin, Dhenkanal,

Dist – Dhenkanal

1.

Objective of the Department : To provide Irrigation to 84,406 Ha. in Dhenkanal,  Angul, Jajpur & Cuttack District.

2.

Organizational Structure :

                                        

  

                 Chief Engineer & Basin Manager, Brahmani Right Basin, Dhenkanal

                                                      1. F.A. & C.A.O., RRCS, Dhenkanal.

                                                      2. Spl. L.A.O., RRCS. Dhenkanal

                                                      3. Quality Control Division, Dhenkanal

                                                      4. Rengali Right Design Division, Dhenkanal.

Superintending Engineer,                                                                                 Superintending Engineer

Irrigation Circle, Dhenkanal                                                                              Angul Irrigation Circle, Angul

1. Rengali Right Canal Division No. II,                                                           1. Rengali Right Division No. I,

    Dhenkanal.                                                                                                                Baghuabol, Talcher

2. Rengali Right Canal Division No. IV,                                                          2. Angul Irr. Division Angul.

    Gudiakateni.                                                                                               3. Manjore Irrigation Division

3. Rengali Right Canal Division No. V,                                                                                        Athamalik.

    Athagarh.                                                    

4. Rengali Right Canal Division No. III,

    Khutuni.

5. Right Canal Division No. VI,

    Jagatpur, Cuttack.

6. Sapua Badjore Irrigation Division

    Chandikhole.

 3.

 Activities of the Department :

i. Excavation of Brahmani Right Main Canal from RD.00 KM to 95.00 KM with Distributary, Minors and Sub-Minors.

ii. Maintenance of  Medium Project.  : Derajang, Aunli, Dadaraghati in Angul District.

                                                          Ramial & Sapua Badjore in Dhenkanal Distric

iii. Excavation of Manjore Irrigation Project (Medium) 

 4.

Division in the District :

(d)        Manjore     

       (i) RRC Divn. No. I, Baghuabol = 1 Division in Angul District.

       (ii) RRC Division No. II, Dhenkanal RRC Division No. IV, Gudiakateni Quality Control Division,    Dhenkanl RR Design Division, Dhenkanal = 4 Division in Dhenkanal District

       (iii) RC Division No. V, Athagarh RC Division No. VI, Jagatpur, RRC Division No. III, Khutuni = 3 Divisions in Cuttack district.

       (iv) Sapua Badjore Irrigation Divn. Chandikhole = 1 Division in Jajpur District.

(e)        Medium

        (v) Angul Irrigation Division Angul, Manjore Irrigation Division Athamalik = 2 Divisions in Angul District.

(f)        Minor   -Nil-

 

5.

On going Projects :

(i) Work of Right Bank Canal (RIP) is under progress.

(ii) Work of Manjore Irr. Project (Medium) is under Progress.

6.

E-Procurement venders in the District. 

7.

Empanelled venders in the District.

8.

Financial sanction for the District                       Right Bank Canal (RIP) Manjore IrrigationProject.  on Projects in last 3 Financial years 2007-08         56.0483 Cr.                        11.1422Cr.                                                       2008-09         98.2902 Cr.                        25.8406Cr.                                                           2009-10         61.3860 Cr.                        27.6101Cr.

9.

Registered Contractors names : With their assigned projects - (List enclosed as Annexure-I)

10.

(a)  Up-coming projects in the                       Dhouragoth Irrigation Project (Medium)                      District with budget allocation                        in the District of Angul.  Budget Allocation – Nil.

(b)  Position of Irrigation in the District                    Dhenkanal             -    2043Ha.                                                                                                    Angul                    -    5350 Ha.

11.

No. of Pani Panchayats in the District                     Dhenkanal              -    32 Nos                                                                               Angul                    -    21 Nos.                                                                                          (List enclosed as Annexure)

    12.       Flood Control initiatives                                        -

13.

Achievements                                       Irrigation provided to 7393 Ha. 

14.

Circulars & Notification                                         -

15.

List of P.I. Os in the district                   (List enclosed as Annexure-III)

16.

Contact Details of Officers                    (1) CE &BM, BRB,Dhenkanal.                                                                                                                                                             06762-223264                                                                                                                                                 (2) Asst. to CE& BM, BRB, Dhenkanal                                                                                                                                           06762-226742         

           Projects Status                                                                                                                                                                       Status of different projects undertaken by                                (Annexure-IV & V)                                                                                              the Department with financial details.

Grievance                                                                                                                                                                                Grievance Data & Telephone No. of the authority       –      Telephone No. 06762-223264

 

Annexure - I

1. M/S OCC Ltd.

1.  Cement Concrete lining with paver finish from RD 28050 M to 30360 M (excluding slip zone from RD 28125 M to 28215 M) of RBC under AIBP.

2.  Cement concrete lining with paver finish from RD 30360 M to 36320 M (excluding from RD 30390 M to 30480 M, RD 32340 M to 32630 M, RD 33690 M to 35000 M) of RBC of R.I. subject under AIBP.

3.  Construction of service road & Cement Concrete lining with paver finish within reach RD 570890 KM to 580542 KM including balance work excavation of RBC from RD 57.890 KM to 58.542 KM.

4.  Excavation of Dhalpur Distributary –II & its system with its structures off taking at RD 495 M of Dhalpur Distributary of RBC.

5.  Cement concrete lining with paver finish including construction of Left Bank service road of RBC from RD 60.080 KM to 62.200 KM.

6.  Excavation of GBC from RD 00 KM to RD 1.380 Km & Sambarpatia Minor including its structures of RBC.

7.  Excavation of Gondia Branch Canal from RD 1.380 Km to 2.010 Km including its structures of RBC of R.I.P (Balance work)

8.  Construction of Aqueduct over Badjore Nallah of RD 5.680 Km of Gondia Branch Canal of RBC of R.I.P.

2. R.K.Sahu

1.  Cement concrete lining from RD 26513 M to 28050 M(excluding slip zone from RD 27090 M to 27180 M & 27800 M to 27890 M) of RBC of R.I. subproject under AIBP.

2.  Cement concrete lining with paver finish from RD 33690 M to 35000 M excluding slip zone from RD 34060 M to 34250 M of R.I. subproject under AIBP.

3.  Excavation of Jagannathpur Branch Canal & its system including all structures off taking at RD 22.010 Km of RBC of R.I. Subproject under AIBP.

4. Balance work of construction service road & cement concrete lining with paver finish within RD 45.415 Km to 48.680 Km.

5.  Balance work of construction of service road & cement concrete lining with paver finish within RD 56.000 Km to 57.890 Km of RBC.

6.  Construction of service road & cement concrete lining from RD 74.0 Km to 77.51 Km of RBC.

7.  Construction of service road & cement concrete lining from RD 77.51 Km to 79.0 Km of RBC.

3. Sri Muna Pani

1.  Cement concrete lining with paver finish from RD 4.5 Km to 5.35 Km excluding Super passage at RD (4885 M &4895 M) & CD at RD (5275 M to 5285 M) of R.I. Subproject under AIBP.

2.  Cement Concrete lining with paver finish from RD 24390 M to 26000 M of RBC.

3.  Excavation of escape channel including construction of structures at RD 25815 M of RBC of R.I. Subproject.

4.  Balance work of construction of service road & cement concrete lining with paver finish from RD 52.050 Km to 53930 Km of RBC.

5.  Construction of escape at RD 40.334 Km of RBC.

4. Swastik Stevedores Pvt. Ltd

1 Cement Concrete lining with paver finish from RD 6275 M to 8850 M of RBC of R.I. subproject under AIBP.

2.  Cement Concrete lining with paver finish from RD 36320 M to 37830 M of R.I. subproject under AIBP.

3.  Cement Concrete lining with paver finish from RD 37830 M to 39633 M of R.I. Subproject under AIBP. 

5.  Y.B.Construction

1.  Cement concrete Lining with paver finish from RD 14490 M to 16420 M & 16565 M to RD 16650 M of RBC of R.I. subproject under AIBP.

2.  Construction of service road & cement concrete lining with paver finish within reach 53.930 Km to 56.000 Km.

3.  Balance work excavation of GBC from RD 21.76 Km to 23.91 Km including construction of structures but excluding Minors & Sub minors of RBC.

4.  Construction of service road & Cement concrete lining with paver finish within reach 50.330 Km to 52.025 Km.

5.  Construction cross regulator at RD 45.700 Km of RBC.

6.  B. Bhutia

1.  Cement concrete lining with paver finish from RD 19.777 Km to 21.790 Km of RBC of R.I. subproject under AIBP. 

7.  Samal Builder Pvt. Ltd. 

1.  Balance work for excavation of Kharagprasad Branch Canal with its distributaries, Minors & Sub Minors including construction of structures of RBC of R.I. Subproject under AIBP. 

8. Anirudha Das

1Balance work for excavation of Birabarpali Minor off taking at RD 16137 of RBC under R.I. subproject.

9. Bibhuti Pradhan

1.  Balance work for excavation & cement concrete lining at Volunerable reaches of Samal  Distributary system off taking at RD 210 M of RBC.

 10.  S.S. Nanda

1.  Balance work of Sirigida Distributary system off taking at RD 7550 M of RBC under R.I. Subproject including cement concrete lining at volunerable reaches.

11. Saroj Nanda

1.  Balance work for excavation of Dharampur Distributary system off taking at RD 12715 M RBC including Cement concrete lining at volunerable reaches.

12. S.K. Mishra

1.  Balance work of Balipatpur Distributary & Lingerkata Distributary with its Minors, Sub-Minors including construction of structures of RBC of R.I. Subproject under AIBP. 

13. Mahima Alekh Construction Company 

1.  Construction of service road & Cement concrete lining with paver finish within reach 39.633 Km to 42.004 Km.

2. Cement concrete lining with paver finish including construction of Left Bank service road from RD 64.65 Km to 66.250 Km & 67.90 Km to 69.65 Km of RBC. 

14. Rajesh Mohanty

1.  Cement Concrete lining with paver finish including construction of Left Bank service road of RBC from RD 62.200 Km to 63.154 Km. 

15. Benudhar Sahu

1. Cement Concrete lining with paver finish including construction of Left Bank service road from RD 69.65 Km to 91.865 Km of RBC.

16. R.C. Pratihari

1. Cement Concrete lining with paver finish including construction of Left Bank service road from RD 91.865 Km to 74.00 Km of RBC.

2. Excavation of Bega Distributary with S/Ms. & Minors & structures off taking at RD 62.254 Km of RBC.

3. Construction Cement concrete lining with paver finish including construction Left Bank service road from RD 63.15 Km to 64.65 Km of RBC.

17. P.K. Singh

1.    Excavation of Gailo Distributary off taking at RD 62.085 Km of RBC including all structures of R.I.P. under AIBP.

18. S.R. Sahu

1. Construction of Distributary system from RD 23910 M to 31210 M of GBC of RBC.

19. L.R. Makkar

1. Construction of Gondia Branch Canal from RD 39.05 Km to RD 49.12 Km

2. Balance work for excavation of GBC from RD 25.305 Km to 27.72 Km of RBC of R.I.P.

3. Construction of Gondia Branch Canal from RD 33.235 Km to 39.05 Km including all structures of Gondia Branch Canal of RBC AIBP.

20. G.P. Rao 

1. Construction of GBC 31.21 Km to 33.2356 Km including construction of all structures of GBC of RBC of R.I.P.

21. S.K.Sahu 

1. Cement Concrete lining with paver finish including construction of Left Bank service road of RBC from RD 66.25 Km to 67.90 Km of RBC. 

22. Smruti Ranjan Sahu 

1. Balance work for excavation of GBC from RD 5.07 Km to 5.58 Km of RBC of R.I.P. 

23. M.P. Mishra 

1. Excavation of GBC from RD 9.90 Km to 12.84 Km & Ranjan Mishra, Keutabereni Minors, Keutabereni S/M-I & Keutabereni S/M-II including its structures. 

24. Pradeep Kumar Brahma 

1. Balance work of excavation of GBC from RD 14.49 Km to 15.18 Km including its structures.

25. Sanatan Das

1. Balance work of excavation of GBC from RD 15.180 Km to 16.050 Km, Nuagaon Distributary, Nuagaon Minor, Mangalpur Minor including its structures.

26. Laxmidhar Rout

1. Construction of GBC from RD 22.60 Km to 22.72 Km including CD at RD 22.645 Km of R.I.P.